Municipality:
Podujev
Project type:
School
Investment value:
€111,710.65
Year:
01/05/2023
Area:
966.00
Status:
Përfunduar
Electricity consumption before implementation of EE measures:
KWh/vit: 392,886.11
MWh/vit: 289.30
Electricity consumption after implementation of EE measures:
KWh/vit: 103,582.17
MWh/vit: 103.58
Electricity savings after implementation of EE measures:
KWh/vit: 289,303.95
MWh/vit: 289.30
Savings percentage:
74%
CO₂ reduction (tons/year):
18.6
Implemented Measures
-
Thermal insulation of external walls
-
Thermal insulation of the roof
-
Replacement of doors and windows
-
Replacement of lighting fixtures with LED ones
-
Automation of the heating system
-
New pellet boiler