New investments in Energy Efficiency measures in the Municipality of Istog

The Municipality building and the Adem Jashari Cultural Center in Istog are the next projects that will benefit from the third package of investments in energy efficiency measures from the Kosovo Energy Efficiency Fund.

The measures that will be implemented in these two buildings include thermal insulation of the building envelope (insulating walls, windows, and roof efficiently), replacing the existing boiler with a more efficient one, cleaning the pipeline network, installing dynamic thermostatic valves to maintain internal temperatures according to required standards, and conducting electrical work such as replacing inefficient lighting fixtures with LED lighting. These investments total over 580 thousand euros and aim to save around 370 MWh per year, which is approximately 60% of the total consumption of these two buildings. The work is expected to be completed within this year.

We would like to thank the Municipality of Istog for their cooperation, as well as our donors: the EU Office in Kosovo, the World Bank, and the Government of the Republic of Kosovo for their support and funding.

Make a Comment

Your email address will not be published. Required field are marked*

Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare