Nursery “Our Joy”

Municipality: Mitrovica
Project type: Preschool Institution – Nursery
Investment value: €415,997.19
Year: 01/05/2023
Area: 1,745.00
Status: Përfunduar
Electricity consumption before implementation of EE measures: KWh/vit: 706,230.38 MWh/vit: 706.23
Electricity consumption after implementation of EE measures: KWh/vit: 101,854.95 MWh/vit: 101.85
Electricity savings after implementation of EE measures: KWh/vit: 604,375.42 MWh/vit: 604.38
Number of users of the building: 304
Savings percentage: 86%
CO₂ reduction (tons/year): 201.8

Implemented Measures

  1. Thermal insulation of walls

  2. Thermal insulation of the roof

  3. Replacement of lighting with efficient LED lighting

  4. Replacement of doors and windows

  5. Heat pump

  6. New heating network

Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare